Cayley Primary School

Project Information
  • Location
  • London
  • Sector
  • Education, Schools
  • Services
  • Buildings, Structural Engineering, Building Services Engineering
  • Value
  • £4.9m
Partners
  • Architect
  • Rivington Street Studio Architects

MLM were appointed to undertake a site survey to identify the scope of existing services and suitability for extension/connection to the new building. We then provided a detailed survey report, employers design brief, performance design and site supervision for the building services and full design duties for the structural engineering.

The construction was undertaken in the footprint of the existing playground, whilst the school was in occupation.

To provide a low carbon solution, existing site boilers were replaced and a small scale CHP introduced. The initial surveys undertaken revealed that the existing water mains and power supply cables required replacement and the site drainage required diversion and enhancement.

A free standing steel frame with concrete planks provided a fast track solution to the provision of the building frame with the mass assisting the natural ventilation systems. Builders work requirements for the M&E services were included at works, reducing on site time and cost.

Millbrook Park Phase 9 - Projects - MLM

Millbrook Park Phase 9

Buildings
Staines Central - Projects - MLM

Staines Central

Buildings
Ridgeons Saffron Walden - Projects - MLM

Ridgeons Saffron Walden

Buildings
Alcohols Ltd, New Headquarters, Rugby - Projects - MLM

Alcohols Ltd, New Headquarters...

Buildings
Temporary Works - Catholic Bridge, Witham - Projects - MLM

Temporary Works – Cathol...

Infrastructure