Flood Defence Repairs – Felixstowe Ferry

Project Information
  • Location
  • Felixstowe
  • Sector
  • Ports & Harbours / River & Marine
  • Services
  • Infrastructure, Civil Engineering, River & Marine Engineering, Biodiversity & Ecology

MLM were appointed under the ARPoW / WEM Framework to undertake the civil engineering design, ecological survey and mitigation for the repair of over 500m of flood defence at Felixstowe Ferry, Suffolk. The works comprised; removing piled crest wall, raising earth crest with imported material and reinstating a footpath.

The initial works identified that the existing defence was significantly higher than specified and as such various value engineering modifications were able to be introduced into the design. The final design comprised removing a piled crest wall, removing tie rods which posed trip hazards to pedestrians, raising and widening of the crest and slope slackening to the rear face. A compacted type 2 footpath was constructed along the crest.

As part of the scope MLM undertook an intrusive site investigation comprising a number of window samples and associated testing. The results were then used to assess the stability of the existing and proposed defence.

We were also instructed to undertake the necessary ecological works; Following the preliminary survey, MLM successfully implemented mitigation for reptiles on site. 196 reptiles were re-located from the works area before works started, with a further 19 reptiles found under ecologist supervision initial clearance of the site. MLM provided prompt pragmatic advice and support to the contractor when a fire broke out on site, to implement measures to minimise further fire risk whilst avoiding unnecessary impacts on protected species. MLM liaised with the client throughout the works to ensure that any amendments to ecological method statements were agreed by all parties before being implemented.

River Wall Condition Survey - London River Wall

River Wall Condition Survey &#...

Infrastructure
Temporary Works - Catholic Bridge, Witham - Projects - MLM

Temporary Works – Cathol...

Infrastructure
Trashscreen and Penstock design - South Benfleet - Projects - MLM

Trashscreen and Penstock Desig...

Infrastructure
Flood Defence Repairs - Malyons Sluice - Projects - MLM

Flood Defence Repairs – ...

Infrastructure
Woodbridge Flood Defence Wall - Projects - MLM

Woodbridge Flood Defence Wall,...

Infrastructure

This site uses cookies. Find out more

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close