River Wall Condition Survey - London River Wall
River Wall Condition Survey - London River Wall
River Wall Condition Survey - London River Wall

River Wall Condition Survey – London River Wall

Project Information
  • Location
  • River Thames
  • Sector
  • Transport, Ports & Harbours / River & Marine
  • Services
  • Infrastructure, Civil Engineering, River & Marine Engineering

MLM undertook a non-intrusive structural condition survey of an 850m length river wall fronting the South bank of the River Thames between London Bridge and Tower bridge. We also undertook a bathymetric and multi-beam sonar survey of the campshedding and river foreshore to detect defects of the permanently submerged structures without the need to use divers.

A structural condition report was prepared, which highlighted various defects on both the river wall and the campshedding. Recommendations have been made to repair or monitor deficient sections of the wall and we are currently awaiting appointment for the next phase of works.

Key Features

  • Difficult Access – tidal river, soft mud.
  • Consideration of wave action from boats on a busy waterway.
  • Liaison with Authorities (Port of London, Metropolitan Police).
  • Use of engineering judgement to determine construction forms and stability of wall.
Attleborough Strategic Urban Extension - Projects - MLM

Attleborough Strategic Urban E...

Infrastructure
Ridgeons Saffron Walden - Projects - MLM

Ridgeons Saffron Walden

Buildings
Alcohols Ltd, New Headquarters, Rugby - Projects - MLM

Alcohols Ltd, New Headquarters...

Buildings
Airport Business Park, Southend - Projects - MLM

Airport Business Park, Southen...

Infrastructure
Temporary Works - Catholic Bridge, Witham - Projects - MLM

Temporary Works – Cathol...

Infrastructure