Ness Point Head Works, Lowestoft

Project Information
  • Location
  • Suffolk
  • Sector
  • Sewerage Treatment
  • Services
  • Infrastructure, Temporary Works Design, Civil Engineering, Water & Wastewater, Geotechnical Engineering
  • Value
  • £7m

The project comprised a £7m scheme for screening, grit extraction and pumping station for raw sewage.

The scheme included construction of two deep cofferdams, on an existing pumping station site, adjacent to a gas works and the coast.

Working as civil engineering designers for the project in a framework agreement with the partnering team, MLM designed the civil engineering works including major temporary and permanent works and detailing of the architectural element of the project.

MLM provided geotechnical and contamination expertise on this project; this included design, supervising and interpretation of site investigations including pumping tests, assisting in the design of cofferdams, the de-watering schemes and assessing contamination risks to Health and Safety and the environment. MLM were retained during construction to advise on geotechnical and contamination issues.

Key Features

  • 8m deep excavations requiring temporary sheet piling and de-watering measures.
  • Full consideration to contamination issues required due to high grade waste and a gas works on the adjacent site.
  • Design of de-watering system.
Marham Park, Bury St. Edmunds - Projects - MLM

Marham Park, Bury St. Edmunds

Infrastructure
West Drayton Station, London - Projects - MLM

West Drayton Station, London

Buildings
CEFAS, Lowestoft - Projects - MLM

Cefas, Lowestoft

Buildings
The Wicker Man - Alton Towers - Projects - MLM

The Wicker Man – Alton Towers

Buildings
Wembley Pink Car Park, London - Projects - MLM

Wembley Pink Car Park, London

Buildings