Ro-Ro Facility, Port of Tilbury - Projects - MLM
Ro-Ro Facility, Port of Tilbury - Projects - MLM
Ro-Ro Facility, Port of Tilbury - Projects - MLM

Ro-Ro Facility, Port of Tilbury

Project Information
  • Location
  • Tilbury
  • Sector
  • Ports & Harbours / River & Marine
  • Services
  • Infrastructure, Civil Engineering, River & Marine Engineering

Tilbury Docks floating pontoon berth underwent a major upgrade comprising the construction of new berthing and mooring facilities. The scheme intention was to accommodate larger vessels than previously for the import of vehicles weighing up to 70 tonnes. Tilbury Docks floating pontoon berth underwent a major upgrade comprising the construction of new berthing and mooring facilities.  The scheme intention was to accommodate larger vessels than previously for the import of vehicles weighing up to 70 tonnes.

The loading ramp from the ship, combined with the wheel loads from the vehicles as they disembarked from the vessel imposed exceptionally high loads on the pontoons, causing individual pontoons in this location to float lower and thus induce high stresses in the longitudinal steel keelsons.

MLM carried out Finite Element Analysis of the pontoons and keelsons to analyse the stresses in the various elements and designed strengthening works in conjunction with setting operating parameters on the numbers of vehicles in use at any one time.

Key Features

  • Floating pontoon berth, subject to tidal conditions
  • Finite Element Analysis
  • Variable loading conditions
  • Detailed design of strengthening scheme
Marham Park, Bury St. Edmunds - Projects - MLM

Marham Park, Bury St. Edmunds

Infrastructure
West Drayton Station, London - Projects - MLM

West Drayton Station, London

Buildings
CEFAS, Lowestoft - Projects - MLM

Cefas, Lowestoft

Buildings
The Wicker Man - Alton Towers - Projects - MLM

The Wicker Man – Alton Towers

Buildings
Wembley Pink Car Park, London - Projects - MLM

Wembley Pink Car Park, London

Buildings